Yes. We handle arena-scale production at Total Mortgage Arena for concerts and corporate events, coordinating with venue operations on all labor requirements.
Yes. The amphitheater's open-air configuration requires PA system design for outdoor acoustic environments. We produce summer concerts and corporate events there.
Crews staged in Stamford are typically 20 minutes from Bridgeport venues, reducing travel costs and enabling same-day support.
Yes. We use event-grade non-slip vinyl rated to ASTM D2047 for slip resistance. It's the same category of material used for arena and stadium floor graphics. Guests can dance on it in any footwear — heels included — without slipping.
No. The adhesive is low-tack and floor-safe, designed to release cleanly without residue. We've installed on hardwood, portable dance floor systems, sealed concrete, and vinyl venue floors without incident. Sensitive floors get a compatibility test in an inconspicuous area first.
For a 20x20 floor, install runs about 60–75 minutes. A 30x30 floor with tiled seams runs 90–120 minutes. Removal is faster than install — usually 30–45 minutes.